Project: Lance's_650B   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Lance Miller   -  
Project:   Zenair - CH 650 B   -   VIEW REPORTS
Total Hours:667.8
Start/Last Date:Dec 10, 2015 - No Finish Date
Engine:Corvair 2850
Propeller:Warp Drive
Panel:Probably steam gauge + iPad mini mount
 
Friendly URL: https://eaabuilderslog.org?s=Lance's_650B

Home or Last Project Picture

Feb 11, 2023     Replaced front rib #3 on Rt Wing. - (3 hours) Category: Wings
Ordered and recieved replacement front rib #3 (right side). To be clear, this is actually a left wing rib since the flange is on the left (if looking at it from the back). I put a peice of paper on the old rib (everything was perfect except for the ganked up fuel return hole) and traced out the significant holes and shapes. Then cut it out with a sharp knife and scissors as a template. I overlayed the new rib with it, drew the tracelines and cut/drilled out the new rib to match. Came out perfectly. I then drew my flange lines, cleco'd the rib into place, strapped down the leading edge, lined up the rib and drilled them.
 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.